Home      Hotels      Condos      Mixed Use      Dreams      Other Projects      Cool Stuff      Links      Contact

     
    Las Vegas Construction Stats

  

 

 

Casinos by size
World's 24 largest hotels  
Vegas hotel stats  
Crazy #s  
Convention space  
Room inventory   
Who Owns What
Vegas Timeline
 
      Updated 7/16/10
 
 

Project
(sorted alphabetically)

Height when Complete Current Height opening
date
Notes
(
G) denotes LEED Certified
Cost Lead Contractor Lead Architect
1 Aliante Station  9 Floors

150 f

46 m

Opened 11/11/08

675-m

Penta

KGA Architecture
2 Allure  I 41 Floors 466 f 136 m

Opened  1/08

250-m Bovis Lend Lease EDI Architecture
3 Allure  II (to be renamed) 72 Floors 795 f 242 m start date 12/09 12/2011 FAA permit  approved TBA EV&A
4 Boca Raton  Tower 1 8  Floors 146 f 45 m

Opened  7/07

400-m Martin-Harris Const. PGAL Architecture
5 Boca Raton  Tower 2 8   Floors 146 f 45 m

Opened  8/07

6 Caesars Palace  Octavius Tower 23 Floors 350 f 107 m Topped-out 2009 PROJECT STALLED DUE TO CURRENT ECONOMIC CONDITIONS 1.0-b    
7 CityCenter   ARIA Resort Tower 51 Floors 600 f 183 m Opened 12/16/09                         G 9.2-b Perini Building Co. Cesar Pelli
8 CityCenter   The Harmon Hotel 26 Floors TBA TBA Topped-out  Late 2010    stalled due to construction issue Pedersen / Tihany
9 CityCenter   Mandarin Oriental 47 Floors 539 f 164 m Opened 12/6/09                           G Foster and Partners
10 CityCenter   Vdara 57 Floors 554 f 169 m Opened 12/1/09                           G Rafael Viñoly
11 CityCenter   Veer Tower (east) 37 Floors 432 f 132 m Opened 7/16/10                           G Helmut Jahn
12 CityCenter   Veer Tower (west) 37 Floors 432 f 132 m Opened 7/16/10                           G Helmut Jahn
13 Cosmopolitan  Casino Spa Tower 61 Floors 605 f 184 m Topped-out 1st Q/2010 interior work in progress 3.0-b Perini Building Co. Friedmutter Group
14 Cosmopolitan  Beach Resort Tower 53 Floors 583 f 178 m Topped-out 1st Q/2010 interior work in progress
15 Durango Station TBA TBA TBA On hold until further notice TBA    
16 Eastside Cannery 16 Floors     Opened 8/28/08 250-m   Klai Juba
17 Echelon  Hotel Echelon 57 Floors 650 f 198 m Floor 10 3rd Q/10 G   

PROJECT STALLED THROUGH 2009 DUE TO CURRENT ECONOMIC CONDITIONS
4.8-b Tishman Construction BLT Architects
18 Echelon  The Enclave 47 542 f 163 m Floor 10 3rd Q/10 BLT Architects
19 Echelon  Delano tba 466 f 142 m Floor 0 3rd Q/10 Klai Juba
20 Echelon  Mondrian tba TBA TBA Floor 0 3rd Q/10 BLT Architects
21 Echelon  Shangri-La 35 442f 135m Floor 10 3rd Q/10 Klai Juba
22 Encore at Wynn Las Vegas 54 Floors 653 f 199 m Opened 12/22/08 2.2-b Tutor-Saliba Corp. Jerde Partnership/ Butler-Ashworth
23 Fontainebleau 68-Floors 730 f 221 m Topped out TBA G PROJECT STALLED DUE TO BANKRUPTCY 2.9-b Turnberry West Bergman, Walls & Associates
24 Golden Nugget (Rush Tower) 25-Floors 272-f 83-m Opened 11/30/09 150-m Penta Building Group TBA
25 Hard Rock  Paradise Tower 17-Floors TBA TBA Opened 7/09 760-m M. J. Dean Construction Klai Juba
26 Hard Rock  HRH Tower 15-Floors TBA TBA Opened 12/09
27 Hilton Grand Vacations  Tower 2 38 Floors 396 f 120m

Opened   7/07

98-m Penta Building Group MBH Architects
28 Hilton Grand Vacations  Tower 3/4 TBA TBA TBA

On Hold

TBA Penta Building Group MBH Architects
29 Juhl 15 Floors 185 f 56 m Opened 10/09 167-m Turner Construction  
30 Loft 5 05 Floors   65 f 20 m Open 75-m Vanguard Construction  Richard McCann
31 M Resort 15 Floors 226 f 69 m Opened   3/1/09 1.0-b Marnell Corrao Assoc. Marnell Corrao Associates
32 Marriott Springhill Suites 24 Floors     Opened   11/09 100-m    
33 Marriott Grand Chateau Wing 1 of 4 32 Floors 420 f 128 m

Opened   6/05

73-m M. J. Dean Construction Bergman, Walls & Associates
Marriott Grand Chateau Wing 2 of 4 32 Floors 420 f 128 m Opened   11/07
Marriott Grand Chateau Wings 3 & 4 32 Floors 420 f 128 m Slated to begin construction in 2010
  
 

Project
(sorted alphabetically)

Height when Complete Current Height opening
date
Notes
(
G) denotes LEED Certified
Cost Lead Contractor Lead Architect
34 MGM Signature Tower A 40 Floors 475 f 145 m Opened 11/06 400-m Marnell Corrao Assoc. Bergman, Walls & Associates
35 MGM Signature Tower B 40 Floors 475 f 145 m Opened    3/07
36 MGM Signature Tower C 40 Floors 475 f 145 m Opened    6/07
37 Molasky Corporate Center 16 Floors 220f 67m Opened    10/07                               G 107-m Marnell Corrao Assoc. H F Thompson Architects
38 Newport Lofts 23 Floors 334 f 102 m

Opened    8/07

  Breslin Builders WPH Architecture
39 One Las Vegas  Tower 1 20 Floors 236 f 72 m Opened    8/09 142-m J. E. Dunn Construction Kobi Karp Architecture
40 One Las Vegas  Tower 2 20 Floors 236 f 72 m Opened    8/09
41 One Queensridge Place  Tower 1 18 Floors 234 f 71 m Opened    8/07   Pernini Building Co. jma Studios
42 One Queensridge Place  Tower 2 18 Floors 234 f 71 m Opened    8/07
43 Palazzo 53 Floors 642 f 196 m

Opened 12/30/07                           G

1.9-b Taylor International James Rimelspach
44 St Regis Condo Tower (Palazzo) 50 Floors TBA TBA Floor 19 TBA PROJECT STALLED UNTIL 2009 DUE TO CURRENT ECONOMIC CONDITIONS 465-m  
45 Palms Fantasy Tower 40 Floors 457 f 139 m

Opened  9/06

650-m Whiting-Turner Jerde Partnership
46 Palms Place Tower 47 Floors 520 f 158 m

Opened  3/08

M. J. Dean Construction
47 Panorama Towers  Tower 1 33 Floors 403 f 123 m

Opened 12/06

100-m M. J. Dean Construction Klai Juba
48 Panorama Towers  Tower 2 33 Floors 403 f 123 m

Opened  8/07

    Klai Juba
49 Panorama Towers  Tower 3 44 Floors 494 f 150 m Opened  4/09     Taylor Int.
50 Planet Hollywood Towers   Tower 1 50 Floors 600 f 183 m Opened 12/18/09 1.2-b Tutor Saliba Morris Architects
51 Planet Hollywood Towers   Tower 2 50 Floors 600 f 183 m Not yet stated TBA  
52 Platinum 17 Floors 236 f 72 m

Opened  10/06

  Residential Constructors Marnell Corrao
53 Plaza (The) TBA TBA TBA

Not yet started

Possibly cancelled 6-b TBA TBA
54 Red Rock Casino 21 Floors 197 f 60 m

Opened    4/06

1-b Perini Building Co. Friedmutter Group/ Architropolis
55 Red Rock Casino  2nd half of tower 21 Floors 197 f 60 m

Opened    1/07

56 Sahara (new tower) TBA 520f 158m Not yet started TBA   500-m   Marnell Corrao
57 Sky Las Vegas 45 Floors 500 f 152 m

Opened    4/07

300-m M. J. Dean Klai Juba
58 Soho Lofts 16 Floors 225 f 69 m Opened 11/06 60-m Breslin Builders jma Studios
59 South Point  (wing) 1 25 Floors 365 f 111 m Opened 12/05 600-m J. A. Tiberti
Construction Co.
Klai::Juba
60 South Point  (wing) 2 25 Floors 365 f 111 m Opened   9/06
61 South Point  (wing) 3 25 Floors 365 f 111 m

Opened   7/21/08

95-m
62 Streamline Tower 21 Floors 271 f 83 m Opened   6/08 200-m Martin-Harris Const. PGAL Architecture
63 Trump Towers  Tower 1 57 Floors 645 f 197 m

Opened 3/31/08

500-m Perini Building Co. Bergman, Walls & Associates
64 Trump Towers  Tower 2 64 Floors 645 f 197 m Not yet started On hold until further notice 600-m
65 Turnberry Place  Tower 4 42 Floors 477 f 145 m

Opened   9/06

  Perini Building Co.  
66 Turnberry Towers  Tower 1 45 Floors 453 f 138 m

Opened 7/07

700-m Perini Building Co. Robert M. Swedroe
67 Turnberry Towers  Tower 2 45 Floors 453 f 138 m Opened  April 2008
68 World Market Center  Building C 16 Floors 186 f 57 m Opened July 2008 540-m Penta
69 World Market Center  Building B 16 Floors 186 f 57 m

Opened   1/06

345-m Whiting-Turner Jerde Partnership
70 Wyndham (Desert Blue) 19 Floors TBA TBA

Floor 10

early 2010

PROJECT STALLED UNTIL 2009 DUE TO CURRENT ECONOMIC CONDITIONS

TBA   Martin Harris
 

 

updates  .  hotels  .  condos .  mixed use  .  dreams  .  other projects  .  completed  .  cool stuff  .  the map  .  downtown map 
area map  .  southwest map    regional map   .  harmon corridor map   .   who owns what map  .  links  .  contact us  .  sitemap  .  legalese

copyright © 2010 vegastodayandtomorrow.com